Skip to product information
EVM 2.5" SATA SSD Casing USB 3.0 - Transparent Case Cover
Rs. 999.00
EVM · 2.5" SATA SSD Casing · USB 3.0 Transparent
SSD external casing. EVM 2.5" SATA SSD Casing.
EVM 2.5" SATA SSD external casing · USB 3.0 · Transparent · Plug and play.
2.5" SATAUSB 3.0TransparentPlug & Play
TypeExternal SSD/HDD Casing
InterfaceUSB 3.0
Form Factor2.5" SATA
DesignTransparent
Key Features
💾
Turn SSD into Portable Drive
Install any 2.5" SATA SSD or HDD — makes it portable.
⚡
USB 3.0 Speed
High-speed USB 3.0 for fast data transfer.
🎨
Transparent Design
See-through design — see your drive inside.
🔧
Easy Install
Tool-free slide-in installation for any 2.5" drive.
✈️
Portable
Compact portable enclosure.
✊
EVM Quality
Reliable EVM accessory.
Specifications
Brand
EVM
Type
2.5" SATA Enclosure
Interface
USB 3.0
Design
Transparent
Solutions
EVM 2.5" SATA SSD Casing USB 3.0 — Sold by Solutions World
✓ Authorised EVM Reseller · ✓ Genuine Product · ✓ 1 Year EVM Warranty