Skip to product information
EVM 256GB 4-in-1 OTG Flash Drive | USB 3.0 100MB/s | Type-C Type-A Lightning Micro USB | Pendrive for iPhone Android Laptop | 10 Year Warranty (EVM4D/256G)

EVM 256GB 4-in-1 OTG Flash Drive | USB 3.0 100MB/s | Type-C Type-A Lightning Micro USB | Pendrive for iPhone Android Laptop | 10 Year Warranty (EVM4D/256G)

Rs. 5,499.00
EVM · 256GB 4-in-1 OTG Flash Drive · USB 3.0 100MB/s

EVM 256GB 4-in-1 OTG. EVM 256GB 4-in-1 OTG.

EVM 256GB 4-in-1 OTG flash drive · USB 3.0 · 100MB/s · All connectors.

256GB4-in-1 OTGUSB 3.0 100MB/sAll Connectors
💾
Capacity256GB
Speed100MB/s
USB3.0
Connectors4-in-1
Key Features
🔌
4-in-1 All Connectors

One drive for every device type.

USB 3.0 100MB/s

High-speed transfers.

📱
All Device Types

iPhone, Android, USB-C, and standard USB.

💾
256GB Large Storage

Large capacity for videos and large files.

✈️
Travel Essential

The only drive you need to carry.

EVM Quality

Reliable EVM storage.

Specifications
Brand
EVM
Capacity
256GB
Speed
100MB/s
Connectors
4-in-1
EVM 256GB 4-in-1 OTG Flash Drive — Sold by Solutions World
✓ Authorised EVM Reseller  ·  ✓ Genuine Product  ·  ✓ 1 Year EVM Warranty

You may also like